QA/QC Management for O’Hare Pump Station Structures
OWNER: City of Chicago / Department of Aviation
CONSTRUCTION MANAGER: Turner Paschen Aviation Partners
CLIENT: Reyes Group Ltd.
PROJECT: TP-31 K-L Pump Station
LOCATION: O'Hare International Airport (ORD), Chicago, IL
CONSTRUCTION START: October 2023
COMPLETION: March 2025
Autumn Construction Services is providing QA/QC management and administration for Reyes Group Ltd on this project located airside at O’Hare International Airport.
The scope of this project includes several structures associated with the K&L Grade Separated Structure (GSS). These structures include the pump/lift station, the wing walls of the K&L GSS located at the northern end of the GSS, and the wing walls/retaining walls connecting at the southern tip of the K&L GSS.
The pump/lift station has two structures: an equipment room and a wet well/vault designed to service the GSS storm sewer system.
Work will be phased in close coordination with Airport Operations and will require temporary closures of the east-west service road to complete construction. Safety and quality control programs will be paramount throughout the construction phase.