M8 Maintenance Facility at I-88

OWNER: Illinois Tollway
CLIENT: W.E. O’Neil Construction Co.
PROJECT: M8 Maintenance Facility at I-88
LOCATION: Aurora, Il
CONSTRUCTION START: February 2020
COMPLETION: September 2021

Autumn completed work as the prime mechanical contractor to W.E. O’Neil Construction Co. for the construction of the Illinois Tollway M-8 Maintenance Facility located in Aurora, IL along I-88. Our subcontractor partners included Any Temperature, Inc. for mechanical ventilation and Precision Controls for temperature controls and building systems management. The 95,000 SF state-of-the-art energy-efficient facility replaced the existing facility built in 1958. The new M-8 includes fully equipped indoor vehicle maintenance bays, vehicle and material storage areas, offices, and a separate truck wash building and salt dome. Mechanical work by the Autumn team included the installation of in-floor hydronic radiant heat, overhead natural gas-fired radiant heating systems, energy-efficient HVAC equipment, fans, and heat recovery systems. The building was constructed to meet LEED certification standards for sustainable design and construction.

Previous
Previous

PneuFast Point Cloud 3D Rendering

Next
Next

Provident Hospital Chiller and HVAC-3 Cooling Upgrade