Autumn Begins Work on Rush University Medical Center In-Floor Radiant Heating

OWNER: Rush University Medical Center  
CLIENT: Helm Mechanical Inc.   
PROJECT: In-Slab Radiant Heating, Mechanical Piping 
LOCATION: Chicago, Il 
CONSTRUCTION START: July 2021 
COMPLETION: July 2022  

Helm Mechanical has selected Autumn as a subcontractor to provide mechanical piping work for Rush University Medical Center parking facility and pedestrian link. Autumn’s scope of work includes the installation of the underfloor hot water heating system and equipment in the parking facility.  Additionally, we will provide hot water piping, refrigerant, and the installation of unit heaters, fan coils, and AC units for the pedestrian bridge that connects the new parking structure to the existing medical center.   

Previous
Previous

Careers in Construction Month #CICM 2022

Next
Next

Autumn Installs Temperature Control Equipment at UIC Engineering Makerspace