|
Autumn is proud to be part of the team awarded the design of Runway 9C-27C at Chicago O’Hare International Airport. HNTB is leading the team in the design of this runway capable of handling the largest passenger airliners in the world. Autumn will be concentrating on elements of construction phasing, construction packaging and cost estimating. This runway is a critical piece of the O’Hare Modernization Program. Design has begun and construction is expected to be complete in 2014.
This entry was posted
on Friday, June 5th, 2009 at 1:05 pm and is filed under 2009 News, Airports.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.
|